1. A 12" water main is being installed along the shoulder of a rural road. The excavation for the water main will be 4 f
Posted: Mon May 02, 2022 11:17 am
1. A 12" water main is being installed along the shoulder of a rural road. The excavation for the water main will be 4 feet deep and 3.5 feet wide. The soil is estimated to have a swell factor of 0.80 and an angle of repose of 31 degrees. If the stockpile will start 2 feet from the edge of the excavation, and the distance from the edge of the trench to the limits of disturbance is 20 feet, what is the estimated clear space between the far toe and of the stockpile and the limits of disturbance?