urgent please

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

urgent please

Post by answerhappygod »

urgent please
Urgent Please 1
Urgent Please 1 (47.98 KiB) Viewed 19 times
(b) A tall office building of 20 storey has been proposed to be build in the city of Johor Bahru in the near future. As a tall building, the water consumption for the building is expected to be high due to the supply for the use of tenant, air- conditioning cooling towers and irrigation systems. Therefore, the application of a smart water sub-meter system connected to the building's BMS system is one of the strategies that can be used.
(iii)Given that the smart-metering system has a feature of measuring the volume, flow, and pressure of water. Identify TWO (2) specific alert features that can be triggered by the BMS system if there is a problem of water supply or leakage in the building. (6 marks)
Table 1: List of water sub-meter in the proposed building Meter Sub-meter Location No. 1 To cooling tower (roof) 2 To washroom level 20 3 To washroom level 19 4 To washroom level 18 5 To washroom level 17 6 To washroom level 16 9 To washroom level 15 7 To washroom level 14 8 To washroom level 13 9 To washroom level 12 10 To washroom level 11 11 To washroom level 10 12 To washroom level 9 13 To landscape area level 9 14 To Surau level 8 15 To washroom level 1 16 To washroom ground floor level 17 To landscape area ground floor
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply