el a Problem #3 You need to design a park pond for a 3000 m² area for a 100 year, 24 hour duration storm. The runoff coe
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
el a Problem #3 You need to design a park pond for a 3000 m² area for a 100 year, 24 hour duration storm. The runoff coe
el a Problem #3 You need to design a park pond for a 3000 m² area for a 100 year, 24 hour duration storm. The runoff coefficient is 0.35 and the time of concentration is 1 hour. The area is located in East El Paso. The Intensity of the storm in inches/hr is: (5 p) The peak flow in cfs is: (5 p) The probability that this storm will happen in a particular year is: (5 p)