16.00.ft RESERVOB A 0.8 Lo 950ft Pump added to pomp water from PESERVOIRS to RESERVOUR A lettingency 925644 sooft Q = iz

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

16.00.ft RESERVOB A 0.8 Lo 950ft Pump added to pomp water from PESERVOIRS to RESERVOUR A lettingency 925644 sooft Q = iz

Post by answerhappygod »

16 00 Ft Reservob A 0 8 Lo 950ft Pump Added To Pomp Water From Peservoirs To Reservour A Lettingency 925644 Sooft Q Iz 1
16 00 Ft Reservob A 0 8 Lo 950ft Pump Added To Pomp Water From Peservoirs To Reservour A Lettingency 925644 Sooft Q Iz 1 (199.08 KiB) Viewed 22 times
please help me sketching EGL and HGL for this problem
(Ks for the ductile iron pipes is 0.0004 ft in case needed)
I calculated the Power of the pump to be 168.5 horsepower.
16.00.ft RESERVOB A 0.8 Lo 950ft Pump added to pomp water from PESERVOIRS to RESERVOUR A lettingency 925644 sooft Q = izats Pipe 1 L = 6000ft Pipea L=12000 ft D = 1.25ft RESERVON B Pipe 3 L = 8000ft D = 1.5ft b=1.5ft
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply