Chapter 2 EQUIPMENT COSTS (See examples 2.8 & 2.9) Determine cost/hr for a D9N Caterpillar dozer with the following assu

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Chapter 2 EQUIPMENT COSTS (See examples 2.8 & 2.9) Determine cost/hr for a D9N Caterpillar dozer with the following assu

Post by answerhappygod »

Chapter 2 Equipment Costs See Examples 2 8 2 9 Determine Cost Hr For A D9n Caterpillar Dozer With The Following Assu 1
Chapter 2 Equipment Costs See Examples 2 8 2 9 Determine Cost Hr For A D9n Caterpillar Dozer With The Following Assu 1 (43.5 KiB) Viewed 33 times
Chapter 2 Equipment Costs See Examples 2 8 2 9 Determine Cost Hr For A D9n Caterpillar Dozer With The Following Assu 2
Chapter 2 Equipment Costs See Examples 2 8 2 9 Determine Cost Hr For A D9n Caterpillar Dozer With The Following Assu 2 (31.22 KiB) Viewed 33 times
Chapter 2 EQUIPMENT COSTS (See examples 2.8 & 2.9) Determine cost/hr for a D9N Caterpillar dozer with the following assumptions: Engine - 370 hp Overall cost of Money -6% (1) Useful life-5 years (n) Hours used per year - 2200 Initial Cost - $400,000 (P) Cost of tires - $42,000 (for this formula you need to subtract the cost of the tires from the initial cost) Estimated Salvage Value - $40,000 (F) or ((S) for AAl formula] NOTE: Use both the USCF and the All methods to determine the answer. Find the delta (difference) between the answers and use the average of the two . . ANSWER: $/hr STEP 1 Formulas (USCF) Ap = P i (1+1)" (1+1)"-1 Af=flaton] (1+) Ap-Ag 2200 hr/yr $/HR P(n+1)+S(n-1) Formulas (AAL) AAI= = 2n AAIP = $__/YR
AAID AAlp X (1) 2200 $ /HR <1> STEP 2 AAlf = P-F = $_/Year AAlf= AAT,x(i) = $_/HR <2> 2200 AAlp + AAlt = $ = AAl cost/HR /HR USCF cost/hr = $ Ihr AAl cost/hr = Ihr Difference USCF-AAI = $ Ihr Difference /2 = $ Thr Use lower $/hr plus add difference to get average. FINAL NUMBER - $ Ihr