Estimates are made by the Product Owner, but are best checked with the Developers.
Scrum forbids estimating.
Estimates are made by the people doing the work.
Estimated must be in relative units.
Product Backlog items must be estimated in story points.
A Product Owner Wants Advise From The Scrum Master (19.63 KiB) Viewed 945 times