Labor (B1, B2) or machine (B3) costs are not being rolled up. Select the three steps that should be performed in order t

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899559
Joined: Mon Aug 02, 2021 8:13 am

Labor (B1, B2) or machine (B3) costs are not being rolled up. Select the three steps that should be performed in order t

Post by answerhappygod »

Labor (B1, B2) or machine (B3) costs are not being rolled up. Select the three steps that should be performed in order to solve this problem.

A. Verify if there is a Bill of Material for this item in the selected branch/plant.
B. Verify there are hours for Direct Labor, Setup Labor, or Machine Run time.
C. Verify that the time basis code is set correctly on the Bill of Material.
D. Verify that the Accounting Cost Quantity (ACQ) is set correctly in the Item Branch Manufacturing values. E. Verify if the Simulated Work Center Rates exist for the appropriate Work Centers and Cost Methods.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This question has been solved and has 1 reply.

You must be registered to view answers and replies in this topic. Registration is free.


Register Login
 
Post Reply