Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
-
answerhappygod
- Site Admin
- Posts: 899559
- Joined: Mon Aug 02, 2021 8:13 am
Post
by answerhappygod »
If an it_project_manager does not want to equally distribute hours across the resource plan time frame, what allocation spread should be used?
A. Front Load.
B. Back Load.
C. Any.
D. Even.