You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simpli

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899559
Joined: Mon Aug 02, 2021 8:13 am

You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simpli

Post by answerhappygod »

You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? (Choose two.)

A. Assign a measuring point as a production resources/tools (PRT) to a task list operation.
B. Assign a piece of equipment with an allocated measuring point to a task list operation.
C. Assign an inspection document as a PRT to the task list operation.
D. Assign an inspection lot to the task list header.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This question has been solved and has 1 reply.

You must be registered to view answers and replies in this topic. Registration is free.


Register Login
 
Post Reply