How does a performance-based maintenance plan calculate the interval between start date and planned date?
A. Cycle length divided by annual performance
B. Cycle length divided by ((scheduling period) x (cycle modification factor))
C. Cycle length divided by monthly performance
D. Cycle length divided by (annual performance / 365)
How does a performance-based maintenance plan calculate the interval between start date and planned date?
-