DRAG DROP - You have an Exchange Server 2013 database availability group (DAG). Each member of the DAG has two network i

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

DRAG DROP - You have an Exchange Server 2013 database availability group (DAG). Each member of the DAG has two network i

Post by answerhappygod »

DRAG DROP -
You have an Exchange Server 2013 database availability group (DAG). Each member of the DAG has two network interfaces named Network1 and Network2.
Network1 is used for client connections. Network2 is used for database replication.
Network2 fails.
You discover that replication traffic is sent over Network1.
You need to ensure that all of the database replication traffic is sent over Network2. The solution must minimize database replication downtime.
Which three actions should you perform?
To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:
Drag Drop You H 1
Drag Drop You H 1 (26.06 KiB) Viewed 90 times
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply