Under which set of circumstances would a lower priority job run before a higher priority job when both start at the same

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Under which set of circumstances would a lower priority job run before a higher priority job when both start at the same

Post by answerhappygod »

Under which set of circumstances would a lower priority job run before a higher priority job when both start at the same time?

A. when the lower priority job has multiplexing enabled and can join an existing multiplex group
B. when the lower priority job requires media in a volume pool
C. when the higher priority job can use the media already loaded in the drive
D. when the higher priority job has multiple streams set to 4 and four tape drives are available
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply