You are setting up an ACI spine-leaf architecture and interconnecting the spine switches with the leaf switches. Which d

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

You are setting up an ACI spine-leaf architecture and interconnecting the spine switches with the leaf switches. Which d

Post by answerhappygod »

You are setting up an ACI spine-leaf architecture and interconnecting the spine switches with the leaf switches. Which description of what happens after initial setup to activate these interlinks is true?

A. An overlay is created automatically, which creates a setup where the uplinks do not need to be managed manually.
B. The links are creating a Layer 3 network, and all links must be configured as point-to-point links.
C. The interlinks are Layer 2 connections and only the allowed VLAN list must be added.
D. Fabric Path must be configured on the interlinks.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply