Refer to the exhibit. After a failover occurs, which two actions must be performed on Switch-B to manually preempt the o

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Refer to the exhibit. After a failover occurs, which two actions must be performed on Switch-B to manually preempt the o

Post by answerhappygod »

Refer to the exhibit. After a failover occurs, which two actions must be performed on Switch-B to manually preempt the operational primary role back to Switch-A?
(Choose two.)
Refer To The Ex 1
Refer To The Ex 1 (75.98 KiB) Viewed 49 times
A. Configure the local vPC role priority to have a lower value than Switch-A.
B. Configure the local vPC role priority to have a higher value than Switch-A.
C. Disable and then re-enable the vPC peer-keepalive link.
D. Configure the local vPC role priority to have the same value as Switch-A.
E. Disable and then re-enable the vPC peer link.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply