Refer to the exhibit. After a failover occurs, which two actions must be performed on Switch-B to manually preempt the operational primary role back to Switch-A?
(Choose two.)
A. Configure the local vPC role priority to have a lower value than Switch-A.
B. Configure the local vPC role priority to have a higher value than Switch-A.
C. Disable and then re-enable the vPC peer-keepalive link.
D. Configure the local vPC role priority to have the same value as Switch-A.
E. Disable and then re-enable the vPC peer link.
Refer to the exhibit. After a failover occurs, which two actions must be performed on Switch-B to manually preempt the o
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
Refer to the exhibit. After a failover occurs, which two actions must be performed on Switch-B to manually preempt the o
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!