A customer's current Layer 2 infrastructure is running Spanning Tree 802.1d, and all configuration changes are manually

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

A customer's current Layer 2 infrastructure is running Spanning Tree 802.1d, and all configuration changes are manually

Post by answerhappygod »

A customer's current Layer 2 infrastructure is running Spanning Tree 802.1d, and all configuration changes are manually implemented on each switch. An architect must redesign the Layer 2 domain to achieve these goals:
* reduce the impact of topology changes
* reduce the time spent on network administration
* reduce manual configuration errors
Which two solutions should the architect include in the new design? (Choose two.)

A. Implement Rapid PVST+ instead of STP.
B. Implement MST instead of STP.
C. Use VTP to propagate VLAN information and to prune unused VLANs.
D. Configure broadcast and multicast storm control on all switches.
E. Configure dynamic trunking protocol to propagate VLAN information.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply