You are reviewing a building backbone design with a vertically aligned telecommunications room (TR). In the spec you not

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

You are reviewing a building backbone design with a vertically aligned telecommunications room (TR). In the spec you not

Post by answerhappygod »

You are reviewing a building backbone design with a vertically aligned telecommunications room (TR). In the spec you note in a footnote with details that the slots at one end of the telecommunications room (TR) must be flush with the floor and the sleeves provide at the end of the telecommunications room (TR) must also be flush. In your meeting with the electrical engineering firm that has provided the spec, you make the comment that according to best practices, the MINIMUM that slots and sleeves must extend above the finished floor are:

A. 25 mm (1 in) for slots and 51 mm (2 in)
B. 25 mm (1 in) for slots and 25 mm (1 in)
C. 51 mm (2 in) for slots and 25 mm (1 in)
D. 51 mm (2 in) for slots and 51 mm (2 in)
E. 64 mm (2 1/2 in) for slots and 64 mm (2 1/2 in)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply