In the context of hierarchical scheduling, a scheduler is configured with a CIR weight of 0. Which of the following statements is TRUE?
A. The scheduler will be allocated its "within CIR" bandwidth before all other children at the same level have received their "within CIR" bandwidth.
B. The scheduler will be allocated its "within CIR" bandwidth after all other children at the same level have received their "within CIR" bandwidth.
C. The scheduler will be allocated its "within CIR" bandwidth after all other children at all levels have received their "within CIR" bandwidth.
D. The scheduler will not be allocated its "within CIR" bandwidth.
In the context of hierarchical scheduling, a scheduler is configured with a CIR weight of 0. Which of the following stat
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
In the context of hierarchical scheduling, a scheduler is configured with a CIR weight of 0. Which of the following stat
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!