- 1 Evaluate The Following 2 Log 25 21093 21096 Log 20 Log 2x 1 10 Dog 3x 2 3a The Cost Of Constructing A Table 1 (51.78 KiB) Viewed 13 times
(1) Evaluate the following: 2₂log 25-21093 +21096 = log 20 log (2x+1) 10 -dog (3x-2) 3a The Cost of Constructing a table
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
(1) Evaluate the following: 2₂log 25-21093 +21096 = log 20 log (2x+1) 10 -dog (3x-2) 3a The Cost of Constructing a table
(1) Evaluate the following: 2₂log 25-21093 +21096 = log 20 log (2x+1) 10 -dog (3x-2) 3a The Cost of Constructing a table xmeters long lares Partly as x and Partly 08 x² klken the table is 3.0m long, it costs de 300.00 to Construct. If the length is 2.5m long, it costs de 275.00. Find. = The length it the cost are @te. 450.00 Ⓒle-125-001 de 150.00 e 600.00 Ⓒ 2e-200.00 The Lost when the length TS: @ 2.0m 100m Ⓒ 1.5m Osmo.sm long. 0.4771 Guten that log 2 = 0 3010, log 3 = 6²6820, 103,5=0.6% and log=0.8451, Evaluate: 130 log 50- (og 30 10 (11 log 45-log 35 to 10 Ⓒlos 0.4 10 (141) (0g(0-16) + (03 (6-8) 10