questions:
Table 1 1.0 2.1 2.2 2.3 2.3.1 2.3.2 2.3.3 2.3.3.1 2.3.3.2 2.3.3.3 2.3.3.4 2.3.3.5 2.3.3.6 2.3.3.7 2.3.3.8 2.3.4 2.3.4.1 2.3.4.2 2.3.4.3 2.3.4.4 2.3.4.5 2.3.4.6 2.3.4.7 2.3.4.8 2.4 2.5 2.6 2.7 2.8 US Deployment Project Project Kick-off Meeting Acquire Materials Cable Infrastructure Installation Assemble Tandem Power Cables Deliver Tandem Power Cables Campus 1 Install Cable Conduits (Campus 1) Execute Cable Runs (Campus 1) Terminate Cable Ends (Remote) (Campus 1) Install Breaker Panels (Campus 1) Terminate cables at Breaker Panels (Campus 1) Install UPS Wrap-Around Circuits (Campus 1) Install two (2) TVSS Units (Campus 1) Sign-off Infrastructure on Campus 1 Cable Installation Campus 2 Install Cable Conduits (Campus 2) Execute Cable Runs (Campus 2) Terminate Cable Ends (Remote) (Campus 2) Install breaker panels (Campus 2) Terminate cables at breaker panel (Campus 2) Install UPS wrap-around circuits (Campus 2) Install one (1) TVSS units (Campus 2) Sign-off Infrastructure on Campus 2 Cable Installation UPS Installation on Campus 1, 2, 3 Acquire UPS units Testing Documentation Training (UPS Appliances and Monitoring Software)
Table 2 # 2356009 8 10 11 12 13 14 15 Sign-off Infrastructure on Campus 1 Cable Installation 582852 17 Install Cable Conduits (Campus 2) 18 Execute Cable Runs (Campus 2) Terminate Cable Ends (Remote) (Campus 2) 20 Install breaker panels (Campus 2) 21 Terminate cables at breaker panel (Campus 2) Install UPS wrap-around circuits (Campus 2) Install one (1) TVSS units (Campus 2) Sign-off Infrastructure on Campus 2 Cable Installation 19 23 Activity 24 Project Kick-off Meeting Acquire Materials Assemble Tandem Power Cables Deliver Tandem Power Cables Install Cable Conduits (Campus 1) Execute Cable Runs (Campus 1) Terminate Cable Ends (Remote) (Campus 1) Install Breaker Panels (Campus 1) Terminate cables at Breaker Panels (Campus 1) Install UPS Wrap-Around Circuits (Campus 1) Install two (2) TVSS Units (Campus 1) 25 26 27 28 29 UPS Installation on Campus 1, 2, 3 Acquire UPS units Testing Documentation Training (UPS Appliances and Monitoring Software) Duration Predecessor(s) Impose Dates (days) 0.5 Key: AFS B - This implies that activity A must finish before activity B can start. A FF B- This implies that activity A cannot finish before activity B. Impose Dates - These dates are determined by the project team prior to the start of the project for activities. Materials for the cabling should arrive by 03/06/15 ORNHUSETT 0 20 2 14 5 3 1 4 2 1 18 TITANSSI∞0 5 5 2 4 4 40 0 17 9 0.5 None 2 3FS + 1 day 5 6 8FF - 8 days 9FF - 2 days 8FF 9FF 12FF - 1 day 13FF 14 6 17FF - 11 days 18FF 17FF - 3 days 18FF 21 FF - 1 day 22FF 23 15, 24, 26 None 25 27 27 03/02/15 03/06/15
Table 3 Resources Assignments Project Kick-off Meeting Acquire Materials Assemble Tandem Power Cables Activity Deliver Tandem Power Cables Install Cable Conduits (Campus 1) Execute Cable Runs (Campus 1) Terminate Cable Ends (Remote) (Campus 1) Install Breaker Panels (Campus 1) Terminate cables at Breaker Panels (Campus 1) Install UPS Wrap-Around Circuits (Campus 1) Install two (2) TVSS Units (Campus 1) Sign-off Infrastructure on Campus 1 Cable Installation Install Cable Conduits (Campus 2) Execute Cable Runs (Campus 2) Terminate Cable Ends (Remote) (Campus 2) Install breaker panels (Campus 2) Terminate cables at breaker panel (Campus 2) Install UPS wrap-around circuits (Campus 2) Install one (1) TVSS units (Campus 2) Sign-off Infrastructure on Campus 2 Cable Installation UPS Installation on Campus 1, 2, 3 Acquire UPS units Testing Documentation Training (UPS Appliances and Monitoring Software) Resources EE (1), PCNet (1), CONT (1) EE (5) EE (1) EE (4), PCNet (3) EE (4), PCNet (4) EE (2), PCNet (1) EE (5) EE (3), PCNet (2) EE (4) EE (2), PCNet (2) EE (1) SUBCONT (5) SUBCONT (4) SUBCONT (4) SUBCONT (2) SUBCONT (5) SUBCONT (2) SUBCONT (2) SUBCONT (1) CONT (3) CONT (3), EE (3), PCNet (3) CONT (3), PCNet (3) PCNet (3), CONT (1)
Table 4 Resources Availability and Pay Rates Resource Electrical Engineers PC & Network Team Contractor Sub-Contractor Abbrev EE PCNet CONT SUBCONT Available Hourly rate 5 swas 6 3 5 $29/hr $35/hr $70/hr $40/hrU
1. Which (if any) of the resources are overallocated? 2. Which (if any) activities involve overallocated resources? 3. If an overallocation problem exist, what is/are the minimum required resource(s) needed to solve this problem? 4. Assume that the project is time constrained and try to resolve any overallocation problems by leveling within slack. What happens? 5. If an overallocation problem exist after leveling within slack, what options are available to meet the deadline if the project is not resource constrained? 6. What is the impact of leveling within slack on the sensitivity of the network?
7. Assume the project is resource constrained (no additional personnel are available) and resolve any overallocation problems by leveling outside of slack. What happens? (Hint: Undo leveling performed in Part A before answering this question.)
Using your files from Part 1, input resources and their costs if you have not already done so. All information is found in Tables 3 and 4. Prepare a memo that addresses the following Using your files from Part 1, input resources and their costs if you have not already done so. All information is found
-