Suppose that one engineering company in Kerteh is awarded by PETRONAS to conduct FEED and costing for construction. The
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Suppose that one engineering company in Kerteh is awarded by PETRONAS to conduct FEED and costing for construction. The
company in Kerteh is awarded by PETRONAS to conduct FEED and costing for construction. The main contractor needs to construct and deliver a deepwater Semi- Submersible Floating Production System (FPS) project, which is expected to be started on 1st January 2023 until end December 2024. Figure 1: Illustration of semi-submersible project(https://mhb.com.my/solutions/offshore) You as Senior Mechanical Engineer that company is given a task to carry out calculation as follow: Case 1: Calculate the correct distance for the telescopic jib crane for the lifting process. Case 2: Propose the range of safe distance for the jib crane. Crane jib - telescopic The distance start from this point (1) Point 2- CARIGALI Distance, m Force, F Figure 2: Simple illustration for the crane system for lifting during construction • Further instruction and list of input data is shown in Table 1. Please read carefully the format for report.
Suppose that one engineering