Problem 4: (25 points) Utilizing the quantities determined in Problem 3 above, determine the labor costs for installatio

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Problem 4: (25 points) Utilizing the quantities determined in Problem 3 above, determine the labor costs for installatio

Post by answerhappygod »

Problem 4 25 Points Utilizing The Quantities Determined In Problem 3 Above Determine The Labor Costs For Installatio 1
Problem 4 25 Points Utilizing The Quantities Determined In Problem 3 Above Determine The Labor Costs For Installatio 1 (61.53 KiB) Viewed 12 times
Problem 4: (25 points) Utilizing the quantities determined in Problem 3 above, determine the labor costs for installation of the joists and plywood. Use the charts below to estimate a loaded hourly crew rate for rough framing. Use the lowest values for labor hours. TABLE 4. Crews for Real Estate Office Crew Concrete Masonry Rough carpentry Finish Roofing Plumbing HVAC Electrical Earthwork Workers 3 cement masons, 2 general laborers 3 masons, 2 general laborers 5 rough carpenters, 2 general laborers 2 finish carpenters, 1 general laborer 2 roofers, 1 general laborer 1 plumber, 1 general laborer 1 HVAC installer, 1 general laborer 2 electricians, 1 general laborer 2 equipment operators, 1 general laborer Trim, fascia soffit Light Framing Sills Joists, floor, and ceiling Walls, interior, exterior (including plates) Rafters, gable roof hip roof Cross-bridging, wood metal Plywood, floor wall roof Unit 100 I MBM MBM MBM MBM 100 sets 100 sets 100 s 100 sf 100 sf 100 100 100 f 100 If baseboard molding FIGURE 14.56. Labor Hours Required for Framing. TABLE 3. Worker Classes for Real Estate Office Worker Class Superintendent General laborer Cement mason Mason Rough carpenter Finish carpenter Roofer Plumber HVAC installer Electrician Equipment operator Labor Hours 2.0 to 4.5 16.0 to 24.0 18.0 to 30.0 18.5 to 30.0 22.0 to 35.0 4.0 to 6.0 3.0 to 5.0 1.0 to 2.0 1.2 to 2.5 1.4 to 2.8 3.5 to 5.0 2.0 to 3.5 1.5 to 2.5 2.0 to 4.0 Hourly Wages $65.00 16.55 21.65 27.20 24.17 28.24 19.35 33.25 43.50 31.75 21.25 Workers' Compen- sation Insurance $6.25 8.42 11.54 9.20 10.66 6.95 12.21 8.25 8.45 8.60 6.25
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply