An Airport runway fill needs 600,000 m3 of soil compacted to a void ratio of 0.75. There are two borrow pits A and B fro

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

An Airport runway fill needs 600,000 m3 of soil compacted to a void ratio of 0.75. There are two borrow pits A and B fro

Post by answerhappygod »

An Airport Runway Fill Needs 600 000 M3 Of Soil Compacted To A Void Ratio Of 0 75 There Are Two Borrow Pits A And B Fro 1
An Airport Runway Fill Needs 600 000 M3 Of Soil Compacted To A Void Ratio Of 0 75 There Are Two Borrow Pits A And B Fro 1 (60.3 KiB) Viewed 136 times
An Airport runway fill needs 600,000 m3 of soil compacted to a void ratio of 0.75. There are two borrow pits A and B from where the required soil can be bought and transported to the site. Which of the two borrow pits would be more economical? Borrow pit A B In situ Void ratio 0.8 1.7 Soil+Transportation Cost 10 LE/m3 5 LE /m3
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply