1.3 A factory near a water fall where the usable head for power generation is 25m. The river flow throughout the year is

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

1.3 A factory near a water fall where the usable head for power generation is 25m. The river flow throughout the year is

Post by answerhappygod »

1 3 A Factory Near A Water Fall Where The Usable Head For Power Generation Is 25m The River Flow Throughout The Year Is 1
1 3 A Factory Near A Water Fall Where The Usable Head For Power Generation Is 25m The River Flow Throughout The Year Is 1 (137.02 KiB) Viewed 49 times
1.3 A factory near a water fall where the usable head for power generation is 25m. The river flow throughout the year is 10m³/sec minimum. The site is developed as a run-of-river type of generating plant without storage, to supply this factory. Assuming the overall efficiency of the plant to be 80% and 1m³ weighs 1000kg. Determine: 1.3.1 The gross plant capacity. [4] 1.3.2 The firm capacity of the plant 1.3.3 The yearly gross output [2] 1.4 In order to operate the generating units near their point of maximum efficiency, the number and size of the units are selected in such a way that they correctly fit the load saturation curve. Mention four important points that must be considered in the selection of the generating units. [24]
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply