A 10m High Embankment With Slope 11 3h Has Been Constructed As Detailed In The Figure Below The Fill Material Has Prope 1 (40.51 KiB) Viewed 13 times
A 10m High Embankment With Slope 11 3h Has Been Constructed As Detailed In The Figure Below The Fill Material Has Prope 2 (40.51 KiB) Viewed 13 times
A 10m High Embankment With Slope 11 3h Has Been Constructed As Detailed In The Figure Below The Fill Material Has Prope 3 (40.51 KiB) Viewed 13 times
A 10m High Embankment With Slope 11 3h Has Been Constructed As Detailed In The Figure Below The Fill Material Has Prope 4 (40.51 KiB) Viewed 13 times
A 10m High Embankment With Slope 11 3h Has Been Constructed As Detailed In The Figure Below The Fill Material Has Prope 5 (40.51 KiB) Viewed 13 times
A 10m High Embankment With Slope 11 3h Has Been Constructed As Detailed In The Figure Below The Fill Material Has Prope 6 (40.51 KiB) Viewed 13 times
A 10m high embankment with slope 11:3H has been constructed as detailed in the figure below. The fill material has properties of y=14 kN/m, Ø=35, and 2-0 kPa, whereas the in-situ material has y=10 kN/m,ø=25*, and c'=5 kPa It is assumed that the groundwater table is at the in-situ groundsurface. Using method of slices, calculate the stability of the slope for the specified slip circle using minimum 6 slices 12.5 m 12.5 m 1 14 kN/m =35 0 10 m Fill material In-situ material 10 kN/m 25 5 kPa
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!