questions on the picture:
There are 15 units of footings and columns
Height of the top of column footing to the natural ground line = 1.5m
From natural ground line to the bottom of the beam = 3.0m
Depth of the beam = 0,30m
Slab thickness = 0.10m
Bend at the footing = 0.50m
Provide dowel for second floor provision = 0.50m
protective side covering for footing foundation = 0.075 m
Protective covering of column = 0.05 m
Consider length of hook and bending = 240mm
use 40cm for tie wire
Please Answer the following questions on the picture, choices are given. Thanks
Number of 10mm bar needed for lateral ties of 15 columns * (5 Points) 350 350 COLUMN C-1 1:10 O 37 42 630 O 126
Number of 10mm bar needed for lateral ties of 15 columns * (5 Points) 350 350 COLUMN C-1 1:10 O 37 42 630 O 126
Using the following figures and data, answer the Number of 10mm bar needed for lateral ties of 15 columns * (5 Points) 350 350 COLUMN C-1 1:10 O 37 42 630 O 126 Number
-