Ramp motering is a traffic engineering idea that requires cars entering a freeway to stop for a certain period of time b

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Ramp motering is a traffic engineering idea that requires cars entering a freeway to stop for a certain period of time b

Post by answerhappygod »

Ramp Motering Is A Traffic Engineering Idea That Requires Cars Entering A Freeway To Stop For A Certain Period Of Time B 1
Ramp Motering Is A Traffic Engineering Idea That Requires Cars Entering A Freeway To Stop For A Certain Period Of Time B 1 (51.6 KiB) Viewed 45 times
Ramp Motering Is A Traffic Engineering Idea That Requires Cars Entering A Freeway To Stop For A Certain Period Of Time B 2
Ramp Motering Is A Traffic Engineering Idea That Requires Cars Entering A Freeway To Stop For A Certain Period Of Time B 2 (60.66 KiB) Viewed 45 times
Ramp motering is a traffic engineering idea that requires cars entering a freeway to stop for a certain period of time before joining the traffic flow. The theory is that ramp metering controls the number of cars on the freeway and the number of cars accessing the freeway, resulting in a freer flow of cars, which ultimately results in faster travel times. To test whether ramp metering is effective in reducing travel times, engineers conducted an experiment in which a section of freeway had ramp meters installed on the on-ramps. The response variable for the study was speed of the vehicles. A random sample of 15 cars on the highway for a Monday at 6 pm with the ramp moters on and a second random sample of 15 cars on a different Monday at 6p.m. with the meters of resulted in the following speeds (in miles per hour). Click the icon to view the data sets. Hi Hon hom M Honor & Ho Hon - Pet Hon Hoff D. Ho Hona Hot Hon Holt Determine the P-value for this test. P-value = 0.043 (Round to three decimal places as needed.) Choose the correct conclusion A. Do not reject Ho. There is not sufficient evidence at the a=0.05 level of significance that the ramp meters are effective in maintaining higher speed on the freeway OB. Reject Ho. There is sufficient evidence at the a = 0,05 level of significance that the ramp meters are effective in maintaining higher speed on the freeway OC. Roject Ho. There is not sufficient evidence at the a= 0.05 level of significance that the ramp motors are effective in maintaining higher speed on the freeway. OD. Do not reject Ho. There is sufficient evidence at the a = 0.05 level of significance that the ramp meters are offective in maintaining higher speed on the freeway a

The response variable for the study was speed of the vehicles. A random sample of 15 cars on the h cond ra In the fol - X a sets. Speed data (in MPH) Full Data Set Ramp Meters On 29 47 56 39 31 24 43 47 51 34 56 41 42 26 46 Ramp Meters Off 23 27 43 35 37 30 47 37 18 28 22 40 38 50 41 decima not suf Print Done in mair ent evic hing his inanan that the rom motors are effective in maintainine
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply