We wish to find a single-sampling plan for a situation where 55000-units lots are shipped from a supplier. The supplier'

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899559
Joined: Mon Aug 02, 2021 8:13 am

We wish to find a single-sampling plan for a situation where 55000-units lots are shipped from a supplier. The supplier'

Post by answerhappygod »

We Wish To Find A Single Sampling Plan For A Situation Where 55000 Units Lots Are Shipped From A Supplier The Supplier 1
We Wish To Find A Single Sampling Plan For A Situation Where 55000 Units Lots Are Shipped From A Supplier The Supplier 1 (21.27 KiB) Viewed 39 times
We wish to find a single-sampling plan for a situation where 55000-units lots are shipped from a supplier. The supplier's process operates at a fallout level of 0.50% defective. We want the AOQL from the inspection activity to be 3% • Find the appropriate Dodge-Romig plan. n= c= • How much inspection will be necessary, on the average, if the supplier's process operates close to the average fallout level? Note: Enter numbers only. The rejectable quality level protection for this plan is %
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply