The canal shown below is laid on a slope of 0.00028. When it reaches a railroad embankment, the flow is to be carried by
The canal shown below is laid on a slope of 0.00028. When it reaches a railroad embankment, the flow is to be carried by 2 concrete pipes (n=0.015) laid on a slope of 3.7m in 1200m. What size of the pipes should be used? For canal n=0.025. The dimensions for B1 is 7500mm, hi is 1400mm, B2 is 8560mm. hi CANAL funt , in B2 K ws Tytz INTENTECHOLT PIPE IRAILROAD CKPAC CANAL g Bi CANAL SECTION lotensschio