A geotechnical exploration of a site has been carried out as shown in the soil profiles, where its properties are shown.

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

A geotechnical exploration of a site has been carried out as shown in the soil profiles, where its properties are shown.

Post by answerhappygod »

A geotechnical exploration of a site has been carried out as
shown in the soil profiles, where its properties are shown. A
footing will be built at each site and will be removed at the
discretion of the designer. Each survey was carried out with the
following characteristics:
• Drilling diameter: 150 mm
• Hammer energy Er = 50 (Hammer efficiency = Er / 60)
• Sampling type: Standard.
For each of the established profiles B-1 through B-3, determine the
following:
A. Recommended shoe size.
B. Allowable Load Capacity.
Load on footing = 350 kN
M = 29 kN-m
Allowable settlement = 25 mm.
C. Estimate the settlement that will occur due to the external load
and check it. Ignore the secondary consolidation settlement.
D. Draw each footing with its soil profile, with the dimensions and
characteristics finally determined.
Note: Based on the soil profiles shown, use correlations to
estimate the strength properties of soils for your
calculations.
N = Number of hits without correcting
NF = Water table
Rock = Weathered Rock
A Geotechnical Exploration Of A Site Has Been Carried Out As Shown In The Soil Profiles Where Its Properties Are Shown 1
A Geotechnical Exploration Of A Site Has Been Carried Out As Shown In The Soil Profiles Where Its Properties Are Shown 1 (43.39 KiB) Viewed 38 times
Prof. (m) 0.00 0.50 1.50 3.00 4.50 6.00 7.50 9.00 10.50 12.00 13.50 N 0 10 12 14 17 19 22 24 27 30 32 ROCK Sondeo B-1 NF @ 3.0 m Clay y = 20.0 kN/m² eo = 0.75 Cc = 0.22 C₁ = 0.03 C₂ = 0.21m²/month N 0 9 13 16 19 22 25 28 31 33 36 ROCK Sondeo B-2 With Out NF Silty Sand y = 17.28 kN/m² eo 1.307 = Ce = 0.36 C₂ = 0.04 preconsolidation = 120 kPa N 0 11 13 10 12 15 22 25 27 28 30 ROCK Sondeo B-3 NF @ 2.0 m Sand y = 19.0 kN/m³ Ysat = 20.0 kN/m² Clay Silty Sand Ysat = 19.16 kN/m² % = 0.7 Cc = 0.25 C₂ = 0.06 preconsolidation = 95.76kPa
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!