2.1. In manual part programing there are two positioning methods, discuss the two methods and give an example with an ai
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
2.1. In manual part programing there are two positioning methods, discuss the two methods and give an example with an ai
2.1. In manual part programing there are two positioning methods, discuss the two methods and give an example with an aid of a diagram [5] 125 10 dia., 2 holes 25+ 12 dia., 1 hole 25 rad. 8 dia., 3 holes 100 75 1 50 25 1+ 25 + --50- 75 100 -150 175 200 Figure 2: Component 2.2 The part in Figure 2 above is to be drilled on a turret-type drill press. The part is 15.0 mm thick. Three drill sizes will be used: 8 mm, 10 mm, and 12 mm, which are to be specified in the part program by tool turret positions T01, TO2, and T03. All tooling is high speed steel. Cutting speed = 75 mm/min and feed = 0.08 mm/rev. Use the lower left corner of the part as the origin in the x-y axis system. 2.2.1 Calculate the speed for cach drill bit [3] 2.2.2. Write the part program in the word address format using absolute positioning, [22]
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!